Contact the team

You are reporting the following problem report for being abusive, containing personal information, or similar:

The swing bridge marine plywood sheets on the pedestriann foot path is rotten , decaying and in key areas missing. Has been reported several time in 2018. All marine plywood needs to be ripped up and replaced with GFR sheeting or steel plate with none slip material before this winter starts. Bridge has several side kick boards missing, and now a third set of holes on the pedestrian way verging to open up. Pedestrian foot path needs to be totally ripped up and replaced with new material. Has been reported several times and nothing seems to be done? Furthermore, total bridge must be due an inspect ton and corrosion inspection and rectification work carried out.When is this scheduled to be done ? I have provided you with photos before . Can you please respond back to me. Thank you

Reported anonymously at 21:28, Friday 30 August 2019

See above

Topic:

optional

Don't like forms?

You can contact technical support on customer.services@bristol.gov.uk