The swing bridge marine plywood sheets on the pedestriann foot path is rotten , decaying and in key areas missing. Has been reported several time in 2018. All marine plywood needs to be ripped up and replaced with GFR sheeting or steel plate with none slip material before this winter starts. Bridge has several side kick boards missing, and now a third set of holes on the pedestrian way verging to open up. Pedestrian foot path needs to be totally ripped up and replaced with new material. Has been reported several times and nothing seems to be done? Furthermore, total bridge must be due an inspect ton and corrosion inspection and rectification work carried out.When is this scheduled to be done ? I have provided you with photos before . Can you please respond back to me. Thank you

Reported in the Bridges/Subways category anonymously at 21:28, Friday 30 August 2019

Sent to Bristol City Council 2 minutes later

See above

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Enquiry raised.

    Posted by Bristol City Council at 20:30, Friday 30 August 2019

  • A citizen has provided a follow-up to the original enquiry.

    Posted by Bristol City Council at 19:25, Sunday 6 October 2019

  • Hello Despite reporting this issue several times in 2018/19 , nobody has reverted back to me on actions planned or taken. Can someone please revert back to me. Many thanks Richard

    Posted by Richard Finch at 20:24, Sunday 6 October 2019