Back to all reports

Meter square metal cover has sunk, probably more than 50 mm on one edge.

Reported in the Utlility Covers category anonymously at 11:40, Thursday 5 March 2020

Sent to Bristol City Council 5 minutes later

Previous cosmetic repair just filled in the depression, Tarmac laid on top of cover to stop the noise made by the cover as it was rocked by traffic has all gone. Needs proper repair, cover and surround need to be lifted and supporting brick work raised so that cover sits level with the road surface.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • A new enquiry has been raised for this issue.

    Posted by Bristol City Council at 11:45, Thursday 5 March 2020

  • This issue is currently under investigation. We'll provide updates on the outcome as soon as we can.

    Posted by Bristol City Council at 15:27, Thursday 5 March 2020

  • Congratulations. At last a proper repair! The manhole surround has been raised so that the cover is level with the roadway. A pity that, whilst the traffic was reduced to one lane, the damaged road surface just a meter up the road was not repaired at the same time. It took a lot of manpower to set up temporary lights and full advantage of this was not taken.

    State changed to: Fixed

    Posted anonymously at 10:50, Friday 20 March 2020

  • This enquiry is now closed. No further action is required.

    Posted by Bristol City Council at 10:55, Friday 20 March 2020

This report is now closed to updates. You can make a new report in the same location.