Back to all reports

Water accumulates at junction of footpath and deterrent paving plus loose concrete transition

Reported via desktop in the Flooding category anonymously at 11:11, Thursday 3 June 2021

Sent to Bristol City Council less than a minute later

Photo of this report zoom

Redact

Photo of this report zoom

Redact

Photo of this report zoom

Redact

1 There is a long-standing problem with flooding at the junction of the footpath with the deterrent paving. The design of the fall does not allow water to discharge into the gulley. The path is often impassable and mud collects here causing a hazard. The path is heavily trafficked as a route to Redland Green School. 2 Water by-passing the gulley runs down the ramp to Alderman's Park and into the garage 3 The pre-cast concrete section at the transition to the garage is loose and is a trip hazard

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • A new enquiry has been raised for this issue.

    Posted by Bristol City Council at 11:12, Thursday 3 June 2021

  • A new enquiry has been raised for this issue.

    Posted by Bristol City Council at 01:59, Friday 4 June 2021

  • A job has been raised with our contractors to action this issue and appropriate repairs or maintenance will be undertaken as soon as they can.

    Posted by Bristol City Council at 11:13, Thursday 1 July 2021

  • A job has been raised with our contractors to action this issue and appropriate repairs or maintenance will be undertaken as soon as they can.

    Posted by Bristol City Council at 11:14, Thursday 1 July 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?