Part of pavement has lifted and left a trip hazard.

Reported via desktop in the Pavement Defect category anonymously at 19:22, Monday 12 July 2021

Sent to Bristol City Council less than a minute later

Photo of this report zoom

Redact

Photo of this report zoom

Redact

Appears a heavy vehicle has moved over a newly repaired section of pavement along the kerb line the pressure on the one side of the repaired section lifting the opposite side about 25mm, the resulting ridge being down the centre of the pavement parallel to the kerb. The worst section is outside No.3 Filton Grove, the resident being elderly and has mobility problems.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • A new enquiry has been raised for this issue.

    Posted by Bristol City Council at 19:22, Monday 12 July 2021

  • This issue is currently under investigation. We'll provide updates on the outcome as soon as we can.

    Posted by Bristol City Council at 10:18, Tuesday 13 July 2021

  • Passed this section of the pavement this morning and it is evident there is further damage to the pavement with the kerb line being compressed more and the raised trip hazard being longer and more elevated. A heavy JCB fork lift truck being used on the site opposite was seen manoeuvering close to this kerb and tracks on the road suggest it has run on the kerb on several occasions.

    Posted anonymously at 13:04, Tuesday 27 July 2021

  • A citizen has provided a follow-up to the original enquiry.

    Posted by Bristol City Council at 13:04, Tuesday 27 July 2021

  • As this issue is not urgent we'll deal with it as part of a future planned work scheme in this area.

    State changed to: Closed

    Posted by Bristol City Council at 13:36, Monday 6 September 2021

This report is now closed to updates. You can make a new report in the same location. Please reference 2859687 in your new report if it is an update on this one.