Closed
Rainwater run-off gullies on Both sides of Hollybush lane footpath are filled with soil
Reported via mobile in the Other issue category anonymously at 18:40, Monday 16 March 2026
Sent to Bristol City Council less than a minute later. FixMyStreet ref: 9118391.
It was great to see the footpath being leaf-blown last summer. Thank you. But this did not clear the soil, debris (and plants now growing in that soil) which has accumulated, over many years, in the rainwater gullies on both sides of Hollybush Lane path, all the way from the back entrance of the Botanic Garden down to the junction with the western end of Ormerod Road (where the drains are also blocked). As you can see in the photographs, the gully is clear or partially clear in small sections , but is quite lost and invisible along most of its length. When it is cleared, rainwater can then follow its correct path down to the drains at the bottom (which will both need to be cleared at the same time), thus avoiding flooding the path itself, and washing leaves out over the path.
Updates
-
A new enquiry has been raised for this issue.
Posted by Bristol City Council at 18:40, Monday 16 March 2026
-
A job has been raised with contractors and appropriate repairs or maintenance will be undertaken as soon as they can.
Posted by Bristol City Council at 12:14, Tuesday 17 March 2026
-
This Fix My Street enquiry has been automatically closed.
State changed to: Closed
Posted by Bristol City Council at 00:06, Monday 27 April 2026
This report is now closed to updates from the public. You can make a new report in the same location. Please reference 9118391 in your new report if it is an update on this one.